Opportunity overview
Supply & Installation of Split Air Conditioners Capacity 1.0 & 1.5 Tons at SSGC LPG Head Office
SSGC-LPG Ltd. (SSGC-LPG Limited)
Reference: P187989
Closes in 4 days
Tender information
- Published
- Submission deadline
- Procurement method
- Request for Quotation
- Procuring agency
- SSGC-LPG Ltd. (SSGC-LPG Limited)
Tender description
- Supply & Installation of Split Air Conditioners Capacity 1.0 Ton at SSGC LPG Head Office
- Supply & Installation of Split Air Conditioners Capacity 1.5 Tons at SSGC LPG Head Office
Technical Specifications
Supply & Installation of Split Air Conditioners Capacity 1.0 Ton at SSGC LPG Head Office
- TECHNICAL SPECIFICATIONS
- Sr. No.
- __EMPTY
- Description
- __EMPTY_1
- Minimum Required Specifications
- TECHNICAL SPECIFICATIONS
- 1
- __EMPTY
- Capacity – 1
- __EMPTY_1
- 1.0 Ton (12,000 BTU/h)
- TECHNICAL SPECIFICATIONS
- 2
- __EMPTY
- Capacity – 2
- __EMPTY_1
- 1.5 Ton (18,000 BTU/h)
- TECHNICAL SPECIFICATIONS
- 3
- __EMPTY
- Type
- __EMPTY_1
- DC Inverter Split Air Conditioner
- TECHNICAL SPECIFICATIONS
- 4
- __EMPTY
- Compressor Warranty/ Guarantee will be provided by the bidder.
- TECHNICAL SPECIFICATIONS
- 5
- __EMPTY
- Warranty Coverage
- __EMPTY_1
- Warranty shall be valid and claimable through the manufacturer's authorized service centers in Karachi.
- TECHNICAL SPECIFICATIONS
- 6
- __EMPTY
- Power Supply
- __EMPTY_1
- Compatible with 220V, single-phase AC electrical supply.
- TECHNICAL SPECIFICATIONS
- 7
- __EMPTY
- Stabilizer Requirement
- __EMPTY_1
- The unit shall operate on the specified power supply without requiring an additional external voltage stabilizer.
- TECHNICAL SPECIFICATIONS
- 8
- __EMPTY
- Warranty Documentation
- __EMPTY_1
- The supplier shall provide original manufacturer-issued warranty cards/documents with each unit at the time of delivery.
- TECHNICAL SPECIFICATIONS
- 9
- __EMPTY
- Condition of Equipment
- __EMPTY_1
- All units shall be brand-new, unused, genuine and free from manufacturing defects.
- TECHNICAL SPECIFICATIONS
- GENERAL REQUIREMENTS
- TECHNICAL SPECIFICATIONS
- 1. The bidder shall clearly mention the offered brand, model number, country of origin and cooling capacity of each offered unit.
- TECHNICAL SPECIFICATIONS
- 2. The bidder shall submit the manufacturer's official technical datasheet/catalogue along with the bid for verification of compliance with the required specifications.
- TECHNICAL SPECIFICATIONS
- 3. All supplied units shall conform to the specifications and warranty requirements stipulated in the bidding documents.
- TECHNICAL SPECIFICATIONS
- 4. The supplier shall be responsible for providing warranty support through authorized service centers in Karachi throughout the applicable warranty period.
- TECHNICAL SPECIFICATIONS
- 5. Any equipment found defective or not conforming to the approved specifications shall be replaced by the supplier at no additional cost to SSGC LPG Limited.
- TECHNICAL SPECIFICATIONS
- Note: All specifications mentioned above are minimum mandatory requirements. The bidder shall clearly indicate compliance against each specification.
Supply & Installation of Split Air Conditioners Capacity 1.5 Tons at SSGC LPG Head Office
- TECHNICAL SPECIFICATIONS
- Sr. No.
- __EMPTY
- Description
- __EMPTY_1
- Minimum Required Specifications
- TECHNICAL SPECIFICATIONS
- 1
- __EMPTY
- Capacity – 1
- __EMPTY_1
- 1.0 Ton (12,000 BTU/h)
- TECHNICAL SPECIFICATIONS
- 2
- __EMPTY
- Capacity – 2
- __EMPTY_1
- 1.5 Ton (18,000 BTU/h)
- TECHNICAL SPECIFICATIONS
- 3
- __EMPTY
- Type
- __EMPTY_1
- DC Inverter Split Air Conditioner
- TECHNICAL SPECIFICATIONS
- 4
- __EMPTY
- Compressor Warranty/ Guarantee will be provided by the bidder.
- TECHNICAL SPECIFICATIONS
- 5
- __EMPTY
- Warranty Coverage
- __EMPTY_1
- Warranty shall be valid and claimable through the manufacturer's authorized service centers in Karachi.
- TECHNICAL SPECIFICATIONS
- 6
- __EMPTY
- Power Supply
- __EMPTY_1
- Compatible with 220V, single-phase AC electrical supply.
- TECHNICAL SPECIFICATIONS
- 7
- __EMPTY
- Stabilizer Requirement
- __EMPTY_1
- The unit shall operate on the specified power supply without requiring an additional external voltage stabilizer.
- TECHNICAL SPECIFICATIONS
- 8
- __EMPTY
- Warranty Documentation
- __EMPTY_1
- The supplier shall provide original manufacturer-issued warranty cards/documents with each unit at the time of delivery.
- TECHNICAL SPECIFICATIONS
- 9
- __EMPTY
- Condition of Equipment
- __EMPTY_1
- All units shall be brand-new, unused, genuine and free from manufacturing defects.
- TECHNICAL SPECIFICATIONS
- GENERAL REQUIREMENTS
- TECHNICAL SPECIFICATIONS
- 1. The bidder shall clearly mention the offered brand, model number, country of origin and cooling capacity of each offered unit.
- TECHNICAL SPECIFICATIONS
- 2. The bidder shall submit the manufacturer's official technical datasheet/catalogue along with the bid for verification of compliance with the required specifications.
- TECHNICAL SPECIFICATIONS
- 3. All supplied units shall conform to the specifications and warranty requirements stipulated in the bidding documents.
- TECHNICAL SPECIFICATIONS
- 4. The supplier shall be responsible for providing warranty support through authorized service centers in Karachi throughout the applicable warranty period.
- TECHNICAL SPECIFICATIONS
- 5. Any equipment found defective or not conforming to the approved specifications shall be replaced by the supplier at no additional cost to SSGC LPG Limited.
- TECHNICAL SPECIFICATIONS
- Note: All specifications mentioned above are minimum mandatory requirements. The bidder shall clearly indicate compliance against each specification.
Official source
Always confirm dates, documents, and submission instructions on the originating portal.
View original tender on Federal PPRA / EPADSSimilar opportunities
Supply of Office Furniture & Fixture
SSGC-LPG Ltd. (SSGC-LPG Limited)
General order supply Request for Quotation Karachi, Sindh
- Published
- Submission deadline
- Not specified
Provide Scaffolding Services on Expansion Pipe Loops to facilitate pipeline inspection on Trestle at SLL Port Qasim Terminal
SSGC-LPG Ltd. (SSGC-LPG Limited)
Request for Quotation Karachi, Sindh
- Published
- Submission deadline
Repair and Re-Winding of 22 KW Explosion Proof Electric Motor of Bowser Loading Pump
SSGC-LPG Ltd. (SSGC-LPG Limited)
Request for Quotation Karachi, Sindh
- Published
- Submission deadline
- Not specified
Replacement of Two Number Broken Monkey Ladders SLL at Port Qasim Terminal
SSGC-LPG Ltd. (SSGC-LPG Limited)
Single Stage-One Envelope
- Published
- Submission deadline
Sandblasting, Painting & other repair works on LPG Bulk Storage Spherical Tank No. 2 installed at SLL Port Qasim Terminal (Under Single Stage Two Envelope Bidding System) in accordance with Terms & Conditions.
SSGC-LPG Ltd. (SSGC-LPG Limited)
Single Stage-Two Envelope
- Published
- Submission deadline
SLL-1481 Inspection, Maintenance, Spare Parts Replacement, Testing & Commissioning of Existing Marine Loading Arm (MLA) Installed at SLL Port Qasim Terminal
SSGC-LPG Ltd. (SSGC-LPG Limited)
Single Stage-Two Envelope
- Published
- Submission deadline