Opportunity overview
(QT-200) THE WORK OF INSTALLATION AND COMMISSIONING OF NEW MOTOR PUMP SET OF ARBORICULTURE IN ALL ASPECTS AT RECEIVING POND PTA UNIT NO.2 (QT-200/26/EE)
Jamshoro Power Company Limited (GENCO-I)
Reference: P193392
Closes in 1 day
Tender information
- Published
- Submission deadline
- Procurement method
- Request for Quotation
- Procuring agency
- Jamshoro Power Company Limited (GENCO-I)
Tender description
- THE WORK OF INSTALLATION AND COMMISSIONING OF NEW MOTOR PUMP SET OF ARBORICULTURE IN ALL ASPECTS AT RECEIVING POND PTA UNIT NO.2 (QT-200/26/EE)
- Dismantling cement concrete reinforcement seprating reinforcement from concrete cleaning and straightening the same WCSR-2022-P-3-2-i(15)
- Reinforcement cement concrete work using coarse sand except the cost of steel reinforcement and its labour for bending and binding. This rate also includes all kinds of forms moulds, lifting shuttering, curing , rendering and finishing the exposed
- Supplying and fabrication Inter mediate grade deformed re-inforcment for RCC piles including cutting, bending, laying in position, welding and fastening including cost of binding wire WCSR-2022 P-5-i-7(a)(i)
- Resting of pump and motor on foundation
- Installation of pump with motor and its attached resting supports, fixing on resting structure with welding/nut bolts.
- Laying of pipe line dia 6” and 8” (R.A Approved)
- Welding joints of suction and discharge connection (R.A Approved) a) 8”
- Welding joints of suction and discharge connection (R.A Approved) a) 6”
- Welding joints of suction and discharge connection (R.A Approved) a) 3”
- Installation of valve dia 8”, 6” and 3” with foot valve (Quotation attached) a) 8”
- Installation of valve dia 8”, 6” and 3” with foot valve (Quotation attached) a) 6”
- Installation of valve dia 8”, 6” and 3” with foot valve (Quotation attached) a) 3”
- Anchor bolts supply and fixing Size: 20 x 200 mm
- Studs with washer and both side nuts Size: 25 to 30mm Egnth : 300 mm (supply and installation)
- Installation of Shed on pump and Motor
Technical Specifications
THE WORK OF INSTALLATION AND COMMISSIONING OF NEW MOTOR PUMP SET OF ARBORICULTURE IN ALL ASPECTS AT RECEIVING POND PTA UNIT NO.2 (QT-200/26/EE) View Proposed BoQ — THE WORK OF INSTALLATION AND COMMISSIONING OF NEW MOTOR PUMP SET OF ARBORICULTURE IN ALL ASPECTS AT RECEIVING POND PTA UNIT NO.2 (QT-200/26/EE)
- Sr. No
- 1
- Sr.
- 1
- Description
- Dismantling cement concrete reinforcement seprating reinforcement from concrete cleaning and straightening the same WCSR-2022-P-3-2-i(15)
- Unit
- Cum
- Qty
- 0.012
- Rate
- 7643.176
- (Rupees Ninety One & Paia Seventy One only)
- Amount
- 91.718112
- Sr. No
- 2
- Sr.
- 2
- Description
- Reinforcement cement concrete work using coarse sand except the cost of steel reinforcement and its labour for bending and binding. This rate also includes all kinds of forms moulds, lifting shuttering, curing , rendering and finishing the exposed surface (including screening and washing of shingle) Ratio: 1:2:4 (WCSR-2022 P-5-/3 (a)(ii)
- Unit
- Cum
- Qty
- 0.012
- Rate
- 27190.451
- Rupees Three Hundred Twenty Six & Paisa Twenty Eight only
- Amount
- 326.285412
- Sr. No
- 3
- Sr.
- 3
- Description
- Supplying and fabrication Inter mediate grade deformed re-inforcment for RCC piles including cutting, bending, laying in position, welding and fastening including cost of binding wire WCSR-2022 P-5-i-7(a)(i)
- Unit
- Kg.
- Qty
- 2.84
- Rate
- 357.788
- (Rupees One Thousand Sixteen & Paisa Eleven Only)
- Amount
- 1016.11792
- Sr. No
- 4
- Sr.
- 4
- Description
- Resting of pump and motor on foundation
- Unit
- Kg.
- Qty
- 478.5
- Rate
- 121.843
- (Rupees Fifty Eight Thousand Three Hundred One & Paisa Eighty Seven only)
- Amount
- 58301.8755
- Sr. No
- 5
- Sr.
- 5
- Description
- Installation of pump with motor and its attached resting supports, fixing on resting structure with welding/nut bolts.
- Unit
- Job
- Qty
- 1
- Rate
- 86710
- (Rupees Eighty Six Thousand Seven Hundred & Ten only)
- Amount
- 86710
- Sr. No
- 6
- Sr.
- 6
- Description
- Laying of pipe line dia 6” and 8” (R.A Approved)
- Unit
- RM
- Qty
- 20.7
- Rate
- 98.141
- (Rupees Two Thousand Thirty One & Paisa Fifty One only)
- Amount
- 2031.5187
- Sr. No
- 7
- Sr.
- 7
- Description
- Welding joints of suction and discharge connection (R.A Approved)
- Sr. No
- 8
- Description
- a) 8"
- Unit
- Joint
- Qty
- 21
- Rate
- 6152.5
- (Rupees One Lac Twenty Nine Thousand Two Hundred Two only)
- Amount
- 129202.5
- Sr. No
- 9
- Description
- b) 6"
- Unit
- Joint
- Qty
- 13
- Rate
- 2981.95
- (Rupees Thirty Eight Thousand Seven Hundred Sixty Sixty Five & Paisa Thirty Five only)
- Amount
- 38765.35
- Sr. No
- 10
- Description
- c) 3"
- Unit
- Joint
- Qty
- 7
- Rate
- 661.25
- (Rupees Four Thousand Six Hundred Twenty Eight & Paisa Seventy Five only)
- Amount
- 4628.75
- Sr. No
- 11
- Sr.
- 8
- Description
- Installation of valve dia 8”, 6” and 3” with foot valve (Quotation attached)
- Sr. No
- 12
- Description
- a) 8"
- Unit
- Nos.
- Qty
- 2
- Rate
- 9200
- (Rupees Eighteen Thousand Four Hundred only)
- Amount
- 18400
- Sr. No
- 13
- Description
- b) 6"
- Unit
- Nos.
- Qty
- 2
- Rate
- 6900
- (Rupees Thirteen Thousand Eight Hundred only)
- Amount
- 13800
- Sr. No
- 14
- Description
- c) 3"
- Unit
- Nos.
- Qty
- 1
- Rate
- 3450
- (Rupees Three Thousand Four Hundred Fifty only)
- Amount
- 3450
- Sr. No
- 15
- Sr.
- 9
- Description
- Anchor bolts supply and fixing Size: 20 x 200 mm
- Unit
- Nos.
- Qty
- 8
- Rate
- 1472
- (Rupees Eleven Thousand Seven Hundred Seventy Six only)
- Amount
- 11776
- Sr. No
- 16
- Sr.
- 10
- Description
- Studs with washer and both side nuts Size: 25 to 30mm Egnth : 300 mm (supply and installation)
- Unit
- No.
- Qty
- 8
- Rate
- 3427
- (Rupees Twenty Seven Thousand Four Hundred Sixty only)
- Amount
- 27416
- Sr. No
- 17
- Sr.
- 11
- Description
- Installation of Shed on pump and Motor
- Unit
- Job
- Qty
- 1
- Rate
- 63250
- (Rupees Sixty Three Thousand Two Hundred Fifty only)
- Amount
- 63250
- GRAND TOTAL:
- Amount
- Rs 459,166.12
Official source
Always confirm dates, documents, and submission instructions on the originating portal.
View original tender on Federal PPRA / EPADSSimilar opportunities
(QT-201) MANUFACTURING OF CAST IRON SLEEVE FOR MOULDING REQUIRED FOR WATER PRE-TREATMENT SECTION TPS, JAMSHORO (QT-201/26/ME(WPT)
Jamshoro Power Company Limited (GENCO-I)
Request for Quotation Dadu, Sindh
- Published
- Submission deadline
(QT-01) RENOVATION OF BUNGALOW NO. B-19 IN RESIDANTIAL COLONY AT THERMAL POWER STATION JAMSHORO.
Jamshoro Power Company Limited (GENCO-I)
Civil construction Request for Quotation Dadu, Sindh
- Published
- Submission deadline
- Not specified
CWD-02-2026/27
Sukkur Power Electric Company (SEPCO)
Single Stage-One Envelope Sukkur, Sindh
- Published
- Submission deadline
66KV T/Line Rasool - Malikwal. Construction of Pile foundation foundations SPA+1 meter raised (04-No.) (Drawing PDW/TC-892). (Item Rate Basis).
Project Director GSC GEPCO (Gujranwala Electric Power Company Limited (GEPCO))
Civil construction Single Stage-Two Envelope Gujranwala, Punjab
- Published
- Submission deadline
ELECTRIFICATION / RENOVATION WORK OF GOVT. HOUSES NO.27-H, STREET NO.11, SECTOR F-6/3. ISLAMABAD.
Electrical Division -II (Capital Development Aurhority (CDA))
Civil construction Single Stage-One Envelope
- Published
- Submission deadline
132KV D/C T/Line from Phalia – Head Faqirian. Construction of Pile foundation foundations SPA+ 2 meter raised (03-No.) (Drawing PDW/TC-892) & Shifting of Material from GEPCO Ware house Wazirabad to site. Erection of Pole type SPA (01-Nos.) along wi
Project Director GSC GEPCO (Gujranwala Electric Power Company Limited (GEPCO))
Civil construction Single Stage-Two Envelope Gujranwala, Punjab
- Published
- Submission deadline